EK Motor Dec 2022 (Q9)

(a) As the Engineer Manager writes standing instructions for the in-service cleaning is the gas side of a waste heat recovery steam generator unit. (8) (b) As the Engineer Manager write standing instruction for the action to be taken in the event of an uptake fire in the waste heat recovery steam generating unit and action to be taken to enable operation of the engine after the fire has been extinguished if there is a leak in the tube nest and no exhaust gas bypass is fitted. (8)

Dec 2022 (Q9)