Tag: #ukmmarineengineering
-

EK Naval Mar 2019 (Q14)
As Chief Engineer Officer of an older vessel which has recently been purchased, state with reasons, the items that should be inspected to ensure that the conditions of assignment of Load Line are satisfactorily complied with. (10) Mar 2019 (Q14)
-

EK Naval Mar 2019 (Q13)
(a) Explain the function and location of EACH of the following: (i) Watertight doors; (3) (ii) Weather tight doors. (3) (b) Explain why it is essential that scuppers and freeing ports are operational at all times. (4) Mar 2019 (Q13)
-

EK Naval Dec 2023 (Q14)
With reference to the overhaul of ship side valves in dry dock: (a) Explain, as Chief Engineer Officer, what essential information should be given to the docking company prior to work commencing (5) (b) Describe how the valves would be overhauled stating the precautions to be taken before returning the ship to service. (5) Dec…
-

EK Naval Dec 2023 (Q13)
(a) Explain the system of classification for access doors passing through watertight bulkheads of a vessel. (3) (b) State THREE circumstances under which all watertight doors must be closed when situations are defined as potentially hazardous. (3) (c) As a Senior Engineer Officer, explain to a new crew member how to pass safely through a…
-

EK Naval Dec 2023 (Q12)
(a) Describe the SIX degrees of motion that a ship at sea moves in when encountering heavy weather. (6) (b) Describe the constructional details that are designed to resist the forces exerted on a ship by the motions described in part (a). (4) Dec 2023 (Q12)
-

EK Naval Dec 2018 (Q14)
During sea trials, extensive noise measurements are taken in accordance with the Code of Practice for Noise Levels in ships. (a) State and explain the unit of sound measurement (2) (b) State the noise level above which personnel are required to wear protection (1) (c) Explain how a ship’s crew may be made aware of…
-

EK Naval Oct 2023 (Q13)
With reference to ship construction, explain the purpose of EACH of the following, stating where EACH are located. (a) Duct keel (2) (b) Bilge keel (2) (C) Collision bulkhead (2) (d) Camber (2) (e) Flare (2) Oct 2023 (Q13)
-

EK Naval Dec 2018 (Q13)
With reference to double hulled oil tankers (a) Sketch a mid ship cross section (5) (b) State the reason this type of design (1) (c) State FOUR disadvantages of this type of design (4) Dec 2018 (Q13)
