Tag: #pressuretestspringloadedreliefvalve

  • EK General Dec 2017 (Q8)

    EK General Dec 2017 (Q8)

    With reference to fixed installation for machinery space fires: (a) sketch a CO2 bottled system (5) (b) Explain how the system sketched in part (a) is protected from overpressure (2) (c) Describe the periodic maintenance required (3) Fire Dec 2017 (Q8)