Tag: #personalprotectiveequipment

  • COSWP
  • EK Motor Mar 2022 (Q4)

    EK Motor Mar 2022 (Q4)

    (a) State, with reason, SIX points which should be covered in a risk assessment for the replacement of a crosshead main engine fuel injection pump in port (6) (b) Write instruction for the replacement of a crosshead main engine fuel injection pump (10) Fuel pump & injectors Mar 2022 (Q4)

  • EK General Dec 2019 (Q8)

    EK General Dec 2019 (Q8)

    During bunkering operations, a section of deck bunker line starts leaking fuel oil from a pinhole at the mid section of the pipe. (a) As Chief Engineer Officer, state the immediate actions to be taken to avoid a potential pollution incident; (6) (b) Explain how a permanent repair could be made, stating any precautions to…

  • EK Motor Mar 2018 (Q5)

    EK Motor Mar 2018 (Q5)

    (a) State, with reason, SIX points which should be covered in a risk assessment for the replacement of a crosshead main engine fuel injection pump in port (6)   (b) Write instruction for the replacement of a crosshead main engine fuel injection pump (10) Mar 2018 (Q5)