Tag: #eknavaloct2019q14

  • EK Naval Oct 2019 (Q14)

    EK Naval Oct 2019 (Q14)

    As Chief Engineer officer, write a dry dock specification for the repair of the following damage that has occurred, stating what factors have to be considered when costing the repairs. Damage to water ballast tank number 1 port wing. The shell plating 15 mm thick for approx. 2 meters square has to be removed and…